Most viewed - Rio_Tinto_Rolling_Stock |

170510 8294379 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

131122 3312375 viewsRio Tinto compressor waggon set CB 08, has been upgraded from the original Robe River compressor waggon set IC 22 with air receiver and IC 23 with two Atlas Copco XAS 97 units replacing the original Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 22nd November 2013.
|
|

060723 7834374 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. 23rd July 2006.
|
|

170728 09690374 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

170510 8283373 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

210322 9584373 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
|
|

110602 8647372 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

170728 09689372 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

170510 8293370 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

210322 9583369 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

210510 1109369 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 011 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

100330 8067368 viewsRio Tinto compressor waggon set CB 05, receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 30th March 2010.
|
|

060715 6950367 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
|
|

210322 9574367 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 121 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

100329 8039366 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
|
|

170510 8292366 viewsRio Tinto compressor waggon set CB 09, air receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
|
|

100330 8066365 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 30th March 2010.
|
|

170728 09687365 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

210510 1140363 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 013 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

110602 8646359 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco. Note these waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|
|
|