Most viewed - BHP_Track_Machines |

050412 0816391 viewsAbydos Siding backtrack, view of cab side and the tamper mechanism of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050421 1176391 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper number board detail view. 21st April 2005.
|
|

050917 5506391 viewsCoon Siding, on the truncated passing siding following a derailment Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060501 3916391 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20. 1st May 2006.
|
|

050410 0524390 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050421 1618389 viewsHesta Siding backtrack, Speno Australia's RR24 model 24 stone rail grinder serial M20 before they had id stickers fitted, this unit was later stickered as RG 1, rear view of the generator and driving module. 21st April 2005.
|
|

050801 4721389 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

050409 0402388 viewsShell Swagman Roadhouse, side view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050625 3602388 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

060501 3918388 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder, serial M20 bar coupled to RG 2. 1st May 2006.
|
|

050625 3814387 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, two Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
|
|

050917 5515387 viewsCoon Siding, view of the tamper operators cabin location on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

050407 0382386 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050421 1612386 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2, side view of the driving cab on the generator module. 21st April 2005.
|
|

050625 3820386 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|

050409 0391385 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of tamper frame and mechanism. 9th April 2005.
|
|

050409 0406385 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view tamper frame bogie. 9th April 2005.
|
|

050410 0517385 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050801 4755385 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
|
|

050410 0503384 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
8 |  |
 |
 |
 |
 |
 |
 |
 |
|