Most viewed - BHP_Track_Machines |

050421 1612441 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2, side view of the driving cab on the generator module. 21st April 2005.
|
|

060710 6227441 viewsAt the Broome Rd grade crossing Port Hedland, Switch Tamper SW 02 a Plasser Australia model Unimat S4 switch tamper. 10th July 2006.
|
|

050407 0381438 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050409 0392437 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050410 0512437 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050409 0402435 viewsShell Swagman Roadhouse, side view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

050410 0525435 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050412 0822435 viewsAbydos Siding backtrack, builders plate of BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401 built in 1993. 12th April 2005.
|
|

050801 4760435 viewsFlash Butt yard, end view of Barclay Mowlem tamping machine TM 8644 a Tamper HSTR 130 model serial 3581011. 1st August 2005.
|
|

060501 3906435 viewsAbydos Siding backtrack, Speno rail grinders RG 2 coupled to RG 1. 1st May 2006.
|
|

050412 0816434 viewsAbydos Siding backtrack, view of cab side and the tamper mechanism of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050411 0601433 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line with the Newman mainline in the foreground. 11th April 2005.
|
|

050412 0809433 viewsAbydos Siding backtrack, builders plate of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050625 3820433 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|

050409 0391432 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 view of tamper frame and mechanism. 9th April 2005.
|
|

050411 0611432 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 runs along the Newman mainline towards Bing Siding. 11th April 2005.
|
|

050421 1176432 viewsAbydos Siding backtrack, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper number board detail view. 21st April 2005.
|
|

050801 4721432 viewsNelson Point yard, ballast regulator BR 33 a Plasser Australia model SSP 302 unit serial M486. 1st August 2005.
|
|

050801 4755432 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
|
|

060403 3272432 viewsTabba North, Barclay Mowlem high-rail Pettibone model 445-E Speed Swing, with the moniker Skinny's Bone. 3rd April 2006.
|
|
| 325 files on 17 page(s) |
 |
 |
 |
 |
 |
7 |  |
 |
 |
 |
 |
 |
 |
 |
 |
|