Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
050518_2111.jpg
CHRY 756 050518 2111387 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 756.
051001_5625.jpg
0206 USA 051001 5625387 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, pushed into an earth bund.
051001_5711.jpg
6208 Comeng WA 051001 5711387 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
050724_4213.jpg
0001 Comeng NSW 050724 4213387 viewsNelson Point yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970, attached to the Pony as they relay a road in the yard.
060429_3742.jpg
6704 060429 3742387 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.
050412_0759.jpg
0520 Magor USA 050412 0759386 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 520.
050518_2134.jpg
CHQY 740 050518 2134386 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740, shows brake rigging plate for original owner, M&ST L.
050518_2175.jpg
0515 Magor USA 050518 2175386 viewsBing Siding. Side view of 1963 built Magor USA waggon 515, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5690.jpg
6207 Comeng WA 051001 5690386 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #14, 6207, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
051001_5706.jpg
6007 Scotts of Ipswich Qld 051001 5706386 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #29, 6007, a Scotts of Ipswich Qld built flat waggon from September 1970.
100717_0672.jpg
6030 Gemco WA 100717 0672386 viewsFlash Butt yard, new rail stock carrier waggon 6030, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0688.jpg
6047 Gemco WA 100717 0688386 viewsFlash Butt yard, new rail winch waggon 6047 obstructed by scrub, view from A end showing rail ramps, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09992.jpg
0003 Comeng NSW 110411 09992386 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
110606_1750.jpg
0711 CNR - QRRS China 110606 1750386 viewsFlash Butt yard, CNR-QRRS of China built side dump waggon, built and delivered in early 2011, waggon 0711 awaits the call to duty.
150314_7747.jpg
0026 CNR - QRRS China 150314 7747386 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0026, one of a batch of ten built in 2014.
050421_1386.jpg
0513 Magor USA 050421 1386385 viewsQuarry 8, Magor USA built ballast waggon 513, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
060618_6212.jpg
8702 Difco USA 060618 6212385 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8702 side dump waggon loaded with fines for pad capping.
060714_6894.jpg
8500 Tomlinson Steel 060714 6894385 viewsGarden Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity.
050319_0143.jpg
6021 Comeng WA 050319 0143384 viewsNelson Point, rail recovery and transport train, 2nd lead off waggon 6201, built by Comeng WA, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050319_0149.jpg
CC1 Mt Newman Mining Workshops 050319 0149384 viewsNelson Point, dumper pilot SD40 3080 with compressor waggon set No. 1, made up of spacer/ballast waggon 681 and compressor waggon 671, both converted from original Magor built 91 ton ore waggons, painted white.
822 files on 42 page(s) 34

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional