Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
110411_10025.jpg
0004 Comeng NSW 110411 10025409 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
150314_7739.jpg
0013 Comeng WA 150314 7739409 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
040815_171312.jpg
0020 Comeng NSW 040815 171312408 viewsNelson Point, fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
050518_2072.jpg
CHQY 730 050518 2072408 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 730.
050518_2189.jpg
0508 Magor USA 050518 2189408 viewsBing Siding. Side view of 1963 built Magor USA waggon 508, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050522_2738.jpg
6201 Comeng WA 050522 2738408 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #28, second lead in waggon 6201, built by Comeng WA in January 1977 under order number 07-M-282 RY, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050525_2985.jpg
6204 Comeng WA 050525 2985408 viewsMooka Siding, rail recovery and transport train flat waggon #10, 6204, built by Comeng WA in February 1977 under order number 07-M-282 RY, with the Gemco built straddle crane.
060429_3727.jpg
060429 3727408 viewsFlash Butt yard, Pony re-laying waggon, builders plate of Mt Newman Mining waggon built in 1970 by Scotts of Ipswich, one of a batch of nine in the series 6005-6013.
060429_3740.jpg
6704 060429 3740408 viewsFlash Butt yard, Pony re-laying waggon 6704 flat waggon, unsure of history or who built it or where it came from, it looks to be heavy duty with riveted side frames and an odd handbrake arrangement.
060501_3901.jpg
8704 Difco USA 060501 3901408 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8704 side dump waggon loaded with ballast.
060618_6209.jpg
8701 Difco USA 060618 6209408 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8701 side dump waggon loaded with fines for pad capping.
081217_0453.jpg
081217 0453408 viewsWoodstock Siding, looking north with the FMG overbridge as the rail recovery and transport train travels south on the mainline. Flat waggon #18 nearest camera.
110208_9444.jpg
6038 Gemco WA 110208 9444408 viewsFlash Butt yard, new rail stock carrier waggon 6038 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
150620_9328.jpg
0209 CNR - QRRS China 150620 9328408 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
040805_095714.jpg
CHQY 741 040805 095714407 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
040806_091046.jpg
040806 091046407 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
050410_0542.jpg
0015 Comeng NSW 050410 0542407 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050412_0735.jpg
0513 Magor USA 050412 0735407 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
050518_2193.jpg
0516 Magor USA 050518 2193407 viewsBing Siding. Side view of 1963 built Magor USA waggon 516, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2202.jpg
0536 Magor USA 050518 2202407 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
822 files on 42 page(s) 20

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional