Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Most viewed - BHP_Rolling_Stock_-_Non_Ore
050518_2204.jpg
050518 2204376 viewsBing Siding, view of hand brake detail and original markings on ballast waggon 532.
050522_2741.jpg
050522 2741376 viewsGoldsworthy Junction, rail recovery and transport train, flat waggon 665, a cut down Magor USA built former Oroville Dam 91 ton ore waggon, used as the crib waggon on the steel train.
050724_4209.jpg
050724 4209376 viewsNelson Point yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970, attached to the Pony as they relay a road in the yard.
060429_3739.jpg
060429 3739376 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
110411_10012.jpg
110411 10012376 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0017 from 1974-5, one of six such tank waggons.
110619_1885.jpg
110619 1885376 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #15, 6206, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
050319_0141.jpg
050319 0141375 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, side view.
051001_5641.jpg
051001 5641375 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, shows bogie and hand brake detail.
051001_5646.jpg
051001 5646375 viewsFlash Butt yard, rear of rake of Magor USA built ballast waggons, 534 is closest to camera and a Dash 8 shunts CFCLA ballast waggons.
051001_5731.jpg
051001 5731375 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #30, 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
080621_2715.jpg
080621 2715375 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train as waggon #7.
130720_1438.jpg
130720 1438375 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
130720_1447.jpg
130720 1447375 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggons 0214 and 0212 loaded awaiting their next duty.
150314_7745.jpg
150314 7745375 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
150523_8201.jpg
150523 8201375 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0035, one of a second batch delivered in 2015 with safety slogan 'Take time to work safely'.
160128_00337.jpg
160128 00337375 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0041, one of a second batch delivered in 2015 with safety slogan 'Stay alert don't get hurt'.
050412_0735.jpg
050412 0735374 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
050518_2167.jpg
050518 2167374 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 524, originally in ore service before conversion to a ballast waggon.
051001_5652.jpg
051001 5652374 viewsFlash Butt yard, rear of rake of Magor USA built ballast waggons, 534 is closest to camera.
051001_5737.jpg
051001 5737374 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
797 files on 40 page(s) 15

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional