233-36374 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4161, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
|
|

233-02372 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

233-32372 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
|
|

233-09371 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-04370 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

233-11369 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-06365 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-23365 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-31363 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-27362 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-08360 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

233-25360 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-20357 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-17356 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-24350 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

233-34346 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
|
|

233-26345 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train around at 1.2 km/h with assistance from two sister units, the end of the 112 waggon or one rake consist can be seen in the middle background. GeoData.
|
|
|
|
|
|
|