Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > 0221

Most viewed - 0221
221-03.jpg
221-03703 viewsHardie Siding, with the days of Goninan GE rebuilt C36-7M units operating numbered, 5513 serial 88-078 / 4839-02 rebuilt from AE Goodwin ALCo C636 5453 serial G6012-2, the drivers side cab 'Kalgan' nameplate has already removed to be fitted to the new GE AC6000 6074.
221-09.jpg
221-09680 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
221-11.jpg
221-11499 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units. Note the end of train device are two flashing red lights, and no digitair.
221-01.jpg
221-01486 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
221-02.jpg
221-02483 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
221-07.jpg
221-07479 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
221-20.jpg
221-20477 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal as it leads a train through the loading vaults, the dust extraction ducting is also visible and the plant stacker can been seen at the very top of the stockpile.
221-08.jpg
221-08463 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
221-04.jpg
221-04461 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
221-15.jpg
221-15460 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
221-05.jpg
221-05448 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
221-16.jpg
221-16448 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
221-06.jpg
221-06432 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 blasts away from Hardie with a loaded train bound for Finucane Island.
221-17.jpg
221-17430 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
221-34.jpg
221-34422 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
221-13.jpg
221-13421 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.
221-35.jpg
221-35418 viewsYandi One mine loadout balloon loop, view out the cab window from near new General Electric AC6000 unit 6074 serial 51066.
221-10.jpg
221-10416 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 heads away from Hardie past the location equipment and the train crew shelter with a loaded train bound for Finucane Island.
221-23.jpg
221-23413 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
221-32.jpg
221-32411 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
37 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional