Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > South Australia - Eyre Peninsula Negative and Digital Albums > 130705

Most viewed - 130705
130705_0656.jpg
130705 0656385 viewsLock, HAN type bogie grain hopper waggon HAN 59 with a crop growing on the waggon end, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130705_0545.jpg
130705 0545384 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0576.jpg
130705 0576384 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the Ascom silo complex (Block 5), the train is loading on the grain loop, horizontal bunker (Block 4) on the right. 5th of July 2013.
130705_0609.jpg
130705 0609384 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.
130705_0618.jpg
130705 0618383 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0542.jpg
130705 0542382 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0590.jpg
130705 0590382 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
130705_0591.jpg
130705 0591382 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1.
130705_0624.jpg
130705 0624382 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0640.jpg
130705 0640382 viewsLock, HAN type bogie grain hopper waggon HAN 13, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130705_0655.jpg
130705 0655382 viewsLock, HAN type bogie grain hopper waggon HAN 59, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130705_0530.jpg
130705 0530381 viewsLock, cab view of Genesee & Wyoming locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge in 2002 before being repainted and transferred to the Eyre Peninsula system in 2003. 5th of July 2013.
130705_0662.jpg
130705 0662381 viewsLock, 1203, 846 and 859 depart along the mainline for Port Lincoln with the loaded grain train.
130705_0626.jpg
130705 0626379 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0569.jpg
130705 0569378 viewsLock, HAN type bogie grain hopper waggon HAN 61, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
130705_0632.jpg
130705 0632378 viewsLock, HAN type bogie grain hopper waggon HAN 26, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
130705_0537.jpg
130705 0537377 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
130705_0602.jpg
130705 0602376 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.
130705_0601.jpg
130705 0601376 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.
130705_0614.jpg
130705 0614376 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
156 files on 8 page(s) 6

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional