Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "965"
0965_060724_7915.jpg
0965 060724 7915173 viewsRobe River ore waggon 965, built by Centurion Industries WA, fixed coupler handbrake side empty view at the 73 km, between Western Creek and Maitland Siding on the Deepdale line. July 24, 2006.
0965_081209_0139.jpg
0965 081209 0139163 viewsRobe River ore waggon 965, built by Centurion Industries WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
0965_170729_0256.jpg
0965 170729 0256185 viewsRobe River ore waggon 965, built by Centurion Industries WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
9657-10658_230309_5891.jpg
09657-10658 230309 589119 viewsFMG 9657 and 10658 on a loaded train at Boodarie, March 9, 2023. Sixty eight waggons numbered from 9591 slave and 10592 control, up to 9657 slave and 10658 control built by CRRC Qiqihar in January and February 2022, and 9625 and higher in June 2022 with lined body stencilled DO NOT WELD and the relined date.
9659-10660_231227_2248.jpg
09659-10660 231227 224816 viewsFMG 9659 and 10660 on an empty train at Boodarie, December 27, 2023. 338 waggons numbered from 9659 slave and 10660 control, up to 9995 slave and 10996 control built by CRRC Qiqihar in 2023 and 2024, with the CNR style body at 22.5 tonne tare.
231020_8188.jpg
231020 8188404 viewsParkeston, QQYY type 40' container waggon QQYY 57965 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000164 with Tronox decal and CRM 001517 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
   
6 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional