Image search results - "959" |

0959 060722 7526172 viewsRobe River ore waggon 959, built by Centurion Industries WA, handbrake side loaded view at the 78.8 km between Western Creek and Maitland on the Deepdale line. July 22, 2006.
|
|

0959 081209 0142164 viewsRobe River ore waggon 959, built by Centurion Industries WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
|
|

09591-10592 230902 724116 viewsFMG 9591 and 10592 on a loaded train at Boodarie, September 2, 2023. Sixty eight waggons numbered from 9591 slave and 10592 control, up to 9657 slave and 10658 control built by CRRC Qiqihar in January and February 2022, and 9625 and higher in June 2022 with lined body stencilled DO NOT WELD and the relined date.
|
|

130708 0823418 viewsMoule, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 59 R, without hungry boards loaded with gypsum, Mewett Rd grade crossing, 470.1 km.
|
|

130708 0898393 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 59 R, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

160525 4560501 viewsParkeston, SCT train 3PG1 which operates from Perth to Parkes NSW (Goobang Junction), originally built by Victorian Railways Ballarat North Workshops in March 1980 as one of seventy five VQCX type container flat waggons built, now in private ownership and reclassed PQCY type, PQCY 959 is now fitted with bulkheads and loaded with a truck flat deck with a collection of items.
|
|

160601 10140455 viewsWest Kalgoorlie, 2MP5 intermodal train, NQOY 14959 container waggon, one of fifty built by Tulloch Ltd NSW as type OCY in 1974/75 with a 40' K&S flatrack KT 4 loaded with mesh and a 20' 25G1 type box RWTU 962017[9].
|
|

161109 1936405 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 59 with hungry boards loaded with gypsum.
|
|
|
|