Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
128-36.jpg
128-36666 viewsNar Nar Goon, up passenger train with Comeng 487M, pausing at platform, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.Apr 24, 2014
128-35.jpg
128-35522 viewsNar Nar Goon, down passenger train with Comeng 377M, guard in doorway, departing, station building and platform, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.Apr 24, 2014
128-34.jpg
128-34562 viewsNar Nar Goon, down passenger train with Comeng 377M, guard in doorway, station building and platform, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.Apr 24, 2014
128-33.jpg
128-33552 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, 3/4 shot, security guard car, stabled during testing phase.Apr 24, 2014
128-32.jpg
128-32468 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, cab front.Apr 24, 2014
128-31.jpg
128-31535 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, 5002T, shows carriage join.Apr 24, 2014
128-30.jpg
128-30523 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, double deck view of middle section.Apr 24, 2014
128-29.jpg
128-29498 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, cab side.Apr 24, 2014
128-28.jpg
128-28491 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, cab side.Apr 24, 2014
128-27.jpg
128-27546 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, stabled during testing phase, 3/4 shot, station platform.Apr 24, 2014
128-26.jpg
128-26509 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, stabled during testing phase, cab front, station building and platform, car next to train is for security guard.Apr 24, 2014
128-25.jpg
128-25595 viewsNar Nar Goon, V/Line broad gauge A class A 77 'Ian Stewart' Clyde Engineering EMD model AAT22C-2R serial 83-1181 rebuilt from B class B 77 Clyde Engineering EMD model ML2 serial ML2-18 with an up passenger train passes the new and under test 4D (Double Deck Development and Demonstration) double deck suburban electric train, test runs. A 77 was named after Australian rules footballer 'Ian Stewart' 09/1984, the green plaque is visible below the drivers window.Apr 24, 2014
128-24.jpg
128-24482 viewsSunbury, V/Line broad gauge N class N 461 'City of Ararat' Clyde Engineering EMD model JT22HC-2 serial 86-1190, N set, down passenger train departing, trailing view.Apr 24, 2014
128-23.jpg
128-23462 viewsSunbury, V/Line broad gauge N class N 461 'City of Ararat' Clyde Engineering EMD model JT22HC-2 serial 86-1190, N set, down passenger train departing, point lever and standpipe visible.Apr 24, 2014
128-22.jpg
128-22591 viewsSunbury, V/Line broad gauge N class N 461 'City of Ararat' Clyde Engineering EMD model JT22HC-2 serial 86-1190, down passenger train, wife talking to driver.Apr 24, 2014
128-21.jpg
128-21442 viewsGisborne semaphore signal Post 3 Up Home and Post 2 facing away Down Home signal, looking south in the Up direction, Down Distant signal Post 1 just visible in the distance.Apr 24, 2014
128-20.jpg
128-20422 viewsGisborne, Gisborne Road grade crossing, non-interlocked swing gates, looking south in the Up direction from middle of the road, station buildings, track view.Apr 24, 2014
128-19.jpg
128-19492 viewsGisborne, Gisborne Road grade crossing, non-interlocked swing gates, looking south in the Up direction, across road is the station building, track view.Apr 24, 2014
128-18.jpg
128-18483 viewsGisborne, station overview looking south, semaphore signal Posts 4 and 5, crossover and Up Refuge Siding, Gisborne Road grade crossing non-interlocked swing gates and station in the distance looking towards Melbourne in the up direction.Apr 24, 2014
128-17.jpg
128-17508 viewsGisborne, Gisborne Road grade crossing non-interlocked swing gates, station building in the background.Apr 24, 2014
19220 files on 961 page(s) 917

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional