Last additions |

130705 0620378 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0619364 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0618344 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0617372 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0616323 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0615335 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0614334 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0613354 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0612396 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
|
|

130705 0611373 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0609349 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0610443 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0608409 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0607402 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0605396 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0606364 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0603405 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the concrete toilet block, Ascom silo complex (Block 5), the train is loading on the grain loop, loaded rake on the mainline, horizontal bunker (Block 4) and the crew barracks. 5th July 2013.Jan 27, 2015
|
|

130705 0604303 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
|
|

130705 0601343 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
|
|

130705 0602337 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
637 |  |
 |
 |
 |
 |
 |
 |
|