Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
060110_2153.jpg
060110 2153505 viewsPillana, former station site, 59 km, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.May 06, 2016
060110_2152.jpg
060110 2152479 viewsPillana, former station site, 59 km, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.May 06, 2016
060110_2150.jpg
060110 2150540 viewsPillana, former station site, 59 km, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.May 06, 2016
239-37.jpg
239-37436 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.Apr 07, 2016
239-36.jpg
239-36433 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.Apr 07, 2016
239-35.jpg
239-35440 viewsYandi Two, cab side shot of Goninan Dash 8 unit CM40-8M 5644 'Kangan' serial 8281-09/92-133, rebuilt from AE Goodwin built ALCo M636 5471 serial G6047-3 still with ALCo Hi-Ad bogies.Apr 07, 2016
239-34.jpg
239-34425 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.Apr 07, 2016
239-31.jpg
239-31449 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls dropped to ground, primary crusher control cabin, ROM bin and drive platform visible. GeoData.Apr 07, 2016
239-33.jpg
239-33400 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.Apr 07, 2016
239-32.jpg
239-32410 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133 with the Yandi Fines stockpile and feed conveyor and pedestal stacker visible.Apr 07, 2016
239-30.jpg
239-30416 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near the gravity take-up tower. GeoData.Apr 07, 2016
239-29.jpg
239-29407 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near exit from primary jaw type crusher. GeoData.Apr 07, 2016
239-28.jpg
239-28401 viewsYandi Two, conveyor belt CV202 failure of the belt on the primary crushing circuit. Shows belt rolls bunched up and sub-station. GeoData.Apr 07, 2016
239-27.jpg
239-27422 viewsYandi Two, conveyor belt CV202 failure of the primary crushing circuit conveyor. GeoData.Apr 07, 2016
239-26.jpg
239-26531 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotives 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 with a LocoTrol equipped Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. GeoData.Apr 07, 2016
239-25.jpg
239-25876 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train LocoTrol equipped locomotive Goninan rebuild CM40-8ML cab-less unit, serial no. 8412-09/94-155 5664 'Kaohsiung' edging towards the load-out tunnel on the 17/01/1997. There was three of these units built without cab, they have all since had cabs fitted. GeoData.Apr 07, 2016
239-24.jpg
239-24544 viewsYandi One balloon loop sees the 1600 empty arrival with mid-train locomotive 5650 'Yawata', a Goninan rebuild GE CM40-8M model serial no. 8412-07/93-141 edging towards the load-out tunnel on the 17/01/1997. GeoData.Apr 07, 2016
239-23.jpg
239-23474 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the radial stacker on the stockpile, power station radiators, new and old side tertiary crushing structures, sub-station 4, the workshops in the background and on the secondary crusher structure. The reclaim tunnels and conveyor CV3 are visible running from the bottom of the image to the secondary crusher. GeoData.Apr 07, 2016
239-22.jpg
239-22389 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the screen house, radial stacker on the stockpile, power station, new and old side tertiary crushing structures, sub-station 4, the control room and on the extreme right the secondary crusher structure. GeoData.Apr 07, 2016
239-21.jpg
239-21434 viewsView from the north western side of the Yandi One ROM (run of Mine) bin showing the operators cabin, Transmin rock breaker, conveyor CV2 running up hill to the left and Sub-Station 1 and the Yandi office complex beyond that on the hill. GeoData.Apr 07, 2016
19096 files on 955 page(s) 524

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional