Last additions |

030415 140420543 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, looking east along the loop siding with the mainline on the right and points and sidings off to the left, loading ramp and crane in distance, town located to the right. GeoData location.Nov 26, 2017
|
|

030415 140027501 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, top of loading ramp and crane. Located on the north side of the line. GeoData location.Nov 26, 2017
|
|

030415 135950486 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, loading ramp and crane. GeoData location.Nov 26, 2017
|
|

030415 135552513 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, looking west at the timber section that carries the points or turnout and the concrete sleepers can be seen starting again. GeoData location.Nov 26, 2017
|
|

030415 135353505 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, dual control point machine at eastern end of loop with manual lever and indicator opposite. GeoData location.Nov 26, 2017
|
|

030415 135321475 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, top of interlocking hut with signal target and solar array. GeoData location.Nov 26, 2017
|
|

030415 135207531 viewsKingoonya, located at the 426.5 km looking west along the Trans Australian Railway shows 1800 metre long loop on the right, 30 km/h speed restriction and interlocking hut, the town is located over on the left. GeoData location.Nov 26, 2017
|
|

030415 135257507 viewsKingoonya, located at the 426.5 km on the Trans Australian Railway, interlocking hut with solar panel, searchlight signal and local indicator. Eastern end looking south. GeoData location.Nov 26, 2017
|
|

24905495 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5503 serial C6104-1 sits out the back in a partially stripped state. This unit was subsequently scrapped. July 1995.
Jim Bisdee photo.Nov 17, 2017
|
|

24903494 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frames laying about, these were subsequently scrapped. July 1995.
Jim Bisdee photo.Nov 17, 2017
|
|

24902452 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state with fellow unit 5503. Both of these units was subsequently scrapped. July 1995.
Jim Bisdee photo.Nov 17, 2017
|
|

24901512 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state. This unit was subsequently scrapped. July 1995.
Jim Bisdee photo.Nov 17, 2017
|
|

24135524 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.Nov 17, 2017
|
|

24134488 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.Nov 17, 2017
|
|

23907464 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 ALCo 251 prime mover, being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.Nov 17, 2017
|
|

23906449 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.Nov 17, 2017
|
|

23904493 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.Nov 17, 2017
|
|

23885477 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is lifted up with the Bell road transport float being prepped underneath for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.Nov 17, 2017
|
|

23884475 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is lifted up with the Bell road transport float being prepped underneath for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.Nov 17, 2017
|
|

23882449 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is being lifted up and prepped for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.Nov 17, 2017
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
315 |  |
 |
 |
 |
 |
 |
 |
|