Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
256-18.jpg
256-18348 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-17.jpg
256-17401 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-16.jpg
256-16430 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-15.jpg
256-15337 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-14.jpg
256-14343 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.Nov 20, 2021
256-13.jpg
256-13361 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-12.jpg
256-12380 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-11.jpg
256-11377 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-10.jpg
256-10395 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-09.jpg
256-09389 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-08.jpg
256-08365 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-07.jpg
256-07377 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
256-06.jpg
256-06377 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
256-05.jpg
256-05361 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
256-04.jpg
256-04369 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-03.jpg
256-03365 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-02.jpg
256-02352 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-01.jpg
256-01378 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
WTT_Combined_Regions_General-Instructions_1986-11-11_.pdf
WTT Combined Regions General-Instructions 1986-11-11 551 viewsGeneral Instructions for the Combined Regions working timetable 11th November 1986.
Complete 154 pages, 15.5 MB download.
Sep 25, 2021
WTT_Combined_Regions_1987-10-11_.pdf
WTT Combined Regions 1987-10-11 479 viewsCombined Regions working timetable 11th October 1987.
Complete 123 pages, 13 MB download.
Sep 24, 2021
19220 files on 961 page(s) 228

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional