Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore > BHP_Rolling_Stock_-_Non_Ore

Last additions - BHP_Rolling_Stock_-_Non_Ore
040806_102110.jpg
0206 Mt Newman Mining Workshops 040806 102110396 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.Jan 18, 2017
040806_102052.jpg
0206 Mt Newman Mining Workshops 040806 102052393 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.Jan 18, 2017
040806_101952.jpg
0206 Mt Newman Mining Workshops 040806 101952420 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of number board and 50 t load stencil.Jan 18, 2017
040806_101934.jpg
0206 Mt Newman Mining Workshops 040806 101934406 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of brake lever arrangement.Jan 18, 2017
040806_101910.jpg
0206 Mt Newman Mining Workshops 040806 101910453 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, 3/4 view from handbrake end.Jan 18, 2017
040806_092738.jpg
0510 Mt Newman Mining Workshops 040806 092738412 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a weighbridge test waggon. The others in the fleet are 40, 60 and 100 tons.Jan 18, 2017
040806_092732.jpg
0522 Mt Newman Mining Workshops 040806 092732452 viewsGoldsworthy Junction, weighbridge test waggon 522, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon. The others in the fleet are 40, 60 and 100 tons.Jan 18, 2017
040806_092434.jpg
0507 Mt Newman Mining Workshops 040806 092434407 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon coupled to 510.Jan 18, 2017
040806_092730.jpg
0507 Mt Newman Mining Workshops 040806 092730423 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.Jan 18, 2017
040806_092046.jpg
040806 092046404 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.Jan 18, 2017
040806_092042.jpg
040806 092042418 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.Jan 18, 2017
040806_091930.jpg
040806 091930397 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.Jan 18, 2017
040806_091334.jpg
040806 091334388 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.Jan 18, 2017
040806_091220.jpg
0510 Mt Newman Mining Workshops 040806 091220420 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a test waggon.Jan 18, 2017
040806_091212.jpg
0507 Mt Newman Mining Workshops 040806 091212435 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.Jan 18, 2017
040806_091154.jpg
040806 091154411 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and two Comeng built ore waggons to provide braking, 5666 is the power.Jan 18, 2017
040806_091122.jpg
040806 091122419 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and one of the two Comeng built ore waggons to provide braking, 5666 is the power.Jan 18, 2017
040806_091046.jpg
040806 091046406 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.Jan 18, 2017
040805_095752.jpg
CHQY 741 040805 095752436 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.Jan 18, 2017
040805_095744.jpg
CHQY 741 040805 095744427 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.Jan 18, 2017
822 files on 42 page(s) 40

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional